Rapid mobilisation Days, nights & weekends Nationwide coverage East Midlands HQ
← All case studies
Logistics

Post-construction deep clean of a new distribution centre

Distribution warehouse interior after a post-construction deep clean

Client

Operator of a new-build distribution centre.

The challenge

A large new-build distribution centre needed a full post-construction clean before it could be handed over for fit-out and go-live. Construction dust and debris had to be cleared from a very large floor plate, the racking and the high-level steelwork, and it all had to be coordinated around the tail end of the build programme so the handover date held.

What we did

We brought in a team sized for the floor area and worked through the building from high level down, so finished areas stayed clean as we went.

The outcome

The building was cleared to a clean, handover-ready standard on schedule, ready for racking, fit-out and go-live.

High-level steelwork of a distribution centre cleaned down
High-level steelwork cleaned down
Operative working at height with access equipment
Working at height with access equipment

Working to a similar deadline? Tell us about the site and we will come back with a quote.

Message us on WhatsApp Get a quote